![sh01 sh01](https://sarakki.com/wp-content/uploads/2016/03/sh01-850x300.jpg)
The project consisted of design and deployment of ITS elements in the cities of Huntington Beach, Fountain Valley and Westminster along the I-405 Corridor. Project components are:
- Design and installation of fiber optic communication backbone
- Design and implementation of an integrated workstation and Graphical User Interface(GUI)
- Development of operational strategies and standard operating procedures
- An interim communication link to Caltrans D-12 using ISDN lines